Downloads

Modificación nº 17 PGOU Environment Intermodal train station Delicias (Area G-44-2)


  1. Index
    1. Cover text revised November 2006.pdf
    2. Index.pdf
  2. Volume I. Report Information
    1. Volume I. Report Information.pdf
  3. Volume II. Memory organization and planning standards
    1. Memory ordering.pdf
    2. Amendment standards urb PGOU.pdf
    3. Card IV annexed Rules Urb.pdf
    4. Ordinances private-G 44-2.pdf
    5. Bookmarks planning.pdf
    6. Table VIII annexed Rules Urb.pdf
    7. Volume II.pdf
  4. Tome III. Annexes to the report
    1. Equipment study .pdf
    2. Traffic study.pdf
    3. Budget.pdf
    4. Analysis of the landscape.pdf
    5. . Volume III Appendices to the report.pdf
  5. Tome IV. Digital mile
    1. Telecommunications Infrastructure.pdf
    2. Home automation of buildings and housing.pdf
    3. Annexes to the report on home automation.pdf
    4. Alternatives for reducing barriers.pdf
    5. Legal aspects.pdf
    6. Volume IV Milla Digita l.pdf
  6. Plans Information
    1. Situation and location.pdf
    2. Planning current plot classification (TR).pdf
    3. Urbanistic structure (TR).pdf
    4. Current planning and regulation of plot rating (TR).pdf
    5. Topography (TR).pdf
    6. Geotechnical (TR).pdf
    7. Hydrology (flooding and aquifer curves) (TR).pdf
    8. Edaphological.pdf
    9. Building, existing uses and ditches (TR).pdf
    10. Infrastructures.pdf
    11. Longitudinal profiles (TR).pdf
    12. Longitudinal profiles (TR).pdf
    13. Water supply (TR).pdf
    14. Sanitation (TR).pdf
    15. Electrical Infrastructure (TR).pdf
    16. Gas infrastructure (TR).pdf
    17. Telecommunications infrastructure (TR).pdf
    18. Ownership structure (TR).pdf
    19. Ownership structure (TR).pdf
    20. Equipments in the environment (TR).pdf
    21. Information.pdf
  7. Plans of ordination
    1. Plot Classification.pdf
    2. Urbanistic structure.pdf
    3. Rated and land regulation.pdf
    4. Rated and regulation (Oliver-Valdefierro Corridor).pdf
    5. Delimitation of the execution unit.pdf
    6. Ordination.pdf
  8. Ordination Plans. Supporting Documents
    1. Movement areas of the building.pdf
    2. Road network plan (TR).pdf
    3. Longitudinal profile: 1 (TR).pdf
      1. Longitudinal profile 2 (TR) Sheet1.pdf
      2. Longitudinal profile 2(TR) Sheet2.pdf
      3. Longitudinal profile 3(TR).pdf
      4. Longitudinal profile 4a and 4b.pdf
      5. Longitudinal profile 5(TR).pdf
      6. Longitudinal profile 6(TR).pdf
      7. Longitudinal profile 7a(TR).pdf
      8. Longitudinal profile 7b(TR).pdf
      9. Longitudinal profile 8(TR).pdf
      10. Longitudinal profile 1(TR).pdf
      11. Longitudinal profile 10(TR) Sheet1.pdf
      12. Longitudinal profile 10(TR) Sheet2.pdf
      13. Longitudinal profile. General floor(TR).pdf
    4. SECTION~1.pdf
    5. Movements Intercity Bus(TR).pdf
    6. REDVI~1.pdf
    7. Galleries of service (TR).pdf
    8. Sewerage and Drainage (TR).pdf
    9. Supply network (TR).pdf
    10. Irrigation network (TR).pdf
    11. REDD~1.pdf
    12. Gas distribution network (TR).pdf
    13. Telecomuncicaciones network (TR) A1-3000 (1).pdf
    14. Network of waste collection (TR).pdf
    15. Image plane.pdf
    16. New ordination. Resting surfaces.pdf
  9. Publication BOPZ according final approval
    1. 070212~1.pdf